Yüklənir

Instance Observations

An Instance Observation records a measurement of one physical product instance at a particular time. It can describe residual capacity, cycle count, or another item-specific metric with its method, conditions, unit, supporting document, and review state.

For example, a release specifies nominal capacity of 10 Ah. A test records 8.6 Ah for battery 000042 after use under stated conditions. This does not change the model's nominal capacity or another battery's measurement.

What makes an observation useful

The record identifies the exact instance, metric, value, unit, observation time, method, and conditions. An optional attribute connects the metric to Actualog's vocabulary. An optional lifecycle event connects it to inspection or service and must concern the same instance.

Different methods and conditions remain distinguishable. An observation is not a general assertion about every batch item. The consuming mapping determines which approved measurement it can use; the most recently saved form is not automatically authoritative for every purpose.

Who prepares and reviews it

A Product Editor, Product Governance Manager, Company Administrator, or permitted evidence contributor prepares the observation. Approval requires a Product Governance Manager, Company Administrator, or explicitly delegated evidence approver for the subject. Production permission alone does not include evidence approval.

Add and approve a measurement

  1. Open Logistic → Quality → Instance Observation, search existing measurements, and choose + Create new instance observation.
  2. Select the exact item by its displayed product/serial information.
  3. Enter metric, measured value, known unit, observation time, method, and conditions. Add the applicable attribute and same-item lifecycle event.
  4. Select the retained supporting document revision and create the draft.
  5. In Lifecycle decision, select Submit, enter a reason, and choose Apply decision. It becomes Pending.
  6. An authorized reviewer checks the item, method, conditions, and source, then applies Approve or Reject with a reason.

Corrections and ongoing measurements

A later genuine measurement is a new observation. For a correction, create a new record with Supersedes Observation pointing to the earlier result for the same instance and metric. Approval preserves and withdraws the predecessor. Do not overwrite an approved result.

Drafts can be edited. Pending, approved, rejected, or withdrawn records require an explicit new record rather than ordinary rewriting. The form version must still match the record during review.

Common blockers

Unknown unit, missing metric/time/method, an event for another item, inaccessible document, mismatched predecessor, or stale version can block the operation. A similar serial is not proof of the same item.

After approval, refresh and review passport drafts that consume this observation. Earlier publications retain their original result and source history.

Product instances · Evidence statements · Product lifecycle events · Maintaining traceability and evidence